Project Summary: Cherry Hill Campground, College Park, MD
This page provides information about solar thermal technology at the Cherry Hill Campground. View the full list of Commercial Solar Thermal Projects.
USH2O encourages you to enter new projects. A new project will appear in the database after it has been reviewed by a USH2O representative. Begin entering your project.
| Project Name | Cherry Hill Campground |
|---|---|
| Owner/Operator | Mike Gurevich |
| City/County | College Park |
| State | Maryland |
| Date Operational | June 2010 |
| Application | Water heating |
| Building Type | Recreation |
| Building or Application Size | 400 ft2 |
| Collector Type | Flat-plate |
| Collector Area | 400 ft2 |
| Collector Manufacturer | AET |
| Storage System Type | Water |
| Storage Size | 480 gallons |
| Auxiliary Fuel | Natural gas |
| System Installation Contractor | Solar Energy Services, Inc. |
| Contractor Contact | Rick Peters |
| Brief Project Description | Solar water system to provide hot water for showers, laundry, and sinks at a conference center. |
| Project Contact | Rick Peters |